Trenches had been dug and pipe laid next to it, but we were there to finish up the piping. We spent two long days doing manual labor to get the trenches evened out or dug out where the tractor had missed, get the pipe laid, and then cover it back up.
Here are some photos my teammate Ben took of us at work. I feel the need to show you proof that I did some hard work!
This was our course of action to get water before. The spigot at the tool shed about a mile up the road.
We're still working on getting the pipe flushed out and approved, but I'm just glad that work is finished. We should have drinkable water by Monday. I'm awfully excited.
No comments:
Post a Comment